How to design central chiller system And Select the system?

Designing a central chiller system involves several steps, including determining the cooling load, selecting the appropriate chiller type, and designing the piping and control systems. Here is a general overview of the process:

  1. Determine the cooling load: This involves calculating the amount of cooling required for the building or facility. The cooling load is typically determined by considering factors such as the size of the building, the number of occupants, and the amount of heat generated by equipment and lighting.
  2. Select the central chiller system: Once the cooling load has been determined, the appropriate type of chiller can be selected. There are several types of chillers, including air-cooled, water-cooled, and absorption chillers. Each type has its own advantages and disadvantages, and the choice will depend on factors such as the availability of water and the cost of energy.
  3. Design the central chiller system: The piping system is responsible for delivering the chilled water to the various air handling units (AHUs) or fan coil units (FCUs) in the building. The design of the piping system will depend on factors such as the distance between the chiller and the AHUs/FCUs, the size of the piping, and the type of insulation required.
  4. Design the control system: The control system is responsible for regulating the operation of the chiller and the distribution of chilled water to the AHUs/FCUs. The control system will typically include sensors to monitor the temperature and pressure of the chilled water, as well as valves and pumps to regulate the flow of water.
  5. Install and commission the system: Once the design is complete, the chiller system can be installed and commissioned. This will involve testing the system to ensure that it is functioning correctly and making any necessary adjustments to the control system.
  6. Regular maintenance is essential to ensure that the chiller system continues to operate efficiently and effectively.

Central chiller system will typically involve tasks such as cleaning the coils and filters, checking the refrigerant levels, and inspecting the piping and control systems for leaks or damage.